Page 65 -- Check also pages: | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 |14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33| 34 | 35 | 36 | 37| 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 | 46 | 47 | 48 | 49 | 50 | 51 | 52 | 53 | 54 | 55 | 56 | 57 | 58 | 59 | 60 | 61 | 62 | 63 | 64 | 66 |

So it is now October 13th, 2007. There have been many changes over the last year or two. We have expanded our breeding program, and now have Bostons and Frenchies available too. They should, at some point, have their own individual sections on this website as well. We now spay or neuter all of our pups, regardless of breed, at 9 weeks of age, prior to them leaving here. As well, we have relocated the kennel to a different area of Kelowna. We are now on 10 acres, surrounded by orchards, overlooking the airport. The dogs have sun earlier in the mornings, when the temperature is still cool enough for them to enjoy it. The construction of the new kennel building is nearing completion. It has taken the last several months. We now have a virtually fire proof facility, with the latest and up to date climate control and heat recovery system available. We have just finished moving the weight pull track over and hope to have the asphalt shingles on it by the end of the month. At this point, we probably won't begin to build the front end offices and hydro therapy pool until the spring, as we have to start preparing for the winter ahead. So from this point on, these photos are of our new location.


Driveway to kennels
There are some larger trees on the property that provide a shaded area during the summer months.
There are large fenced in areas for the dogs to run and play.
Future site of the weight pull track
Breaking ground for the new kennel building
The start of the kennel building
May, '07
May, '07
June, '07
Pouring the outside pads
Pouring the outside pads
Applying the scratch coat
Installing the drywall
Applying a band of acrylic stucco to the interior
The first coat of paint
Cleaning up inside
Feeding trees through the chipper to make way for the weight pull track

Page 65 -- Check also pages: | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 |14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33| 34 | 35 | 36 | 37| 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 | 46 | 47 | 48 | 49 | 50 | 51 | 52 | 53 | 54 | 55 | 56 | 57 | 58 | 59 | 60 | 61 | 62 | 63 | 64 | 66 |